The Resource 2020 census : examining cost overruns, information security, and accuracy : hearing before the Committee on Homeland Security and Governmental Affairs, United States Senate, One Hundred Fifteenth Congress, first session, October 31, 2017

2020 census : examining cost overruns, information security, and accuracy : hearing before the Committee on Homeland Security and Governmental Affairs, United States Senate, One Hundred Fifteenth Congress, first session, October 31, 2017

Label
2020 census : examining cost overruns, information security, and accuracy : hearing before the Committee on Homeland Security and Governmental Affairs, United States Senate, One Hundred Fifteenth Congress, first session, October 31, 2017
Title
2020 census
Title remainder
examining cost overruns, information security, and accuracy : hearing before the Committee on Homeland Security and Governmental Affairs, United States Senate, One Hundred Fifteenth Congress, first session, October 31, 2017
Title variation
Two thousand twenty census : examining cost overruns, information security, and accuracy
Creator
Author
Subject
Genre
Language
eng
Member of
Cataloging source
GPO
Government publication
federal national government publication
Illustrations
illustrations
Index
no index present
LC call number
KF26
LC item number
.H63 2017x
Literary form
non fiction
Nature of contents
  • dictionaries
  • bibliography
http://bibfra.me/vocab/lite/organizationName
United States
Series statement
S. hrg.
Series volume
115-444
http://library.link/vocab/subjectName
  • U.S. Census Bureau
  • U.S. Census Bureau
  • United States
  • United States
  • United States
  • Household surveys
  • Data protection
Label
2020 census : examining cost overruns, information security, and accuracy : hearing before the Committee on Homeland Security and Governmental Affairs, United States Senate, One Hundred Fifteenth Congress, first session, October 31, 2017
Instantiates
Publication
Bibliography note
Includes bibliographical references
Carrier category
online resource
Carrier category code
cr
Carrier MARC source
rdacarrier
Color
black and white
Content category
text
Content type code
txt
Content type MARC source
rdacontent
Dimensions
unknown
Extent
1 online resource (iii, 228 pages)
File format
one file format
Form of item
online
Media category
computer
Media MARC source
rdamedia
Media type code
c
Other physical details
illustrations.
Specific material designation
remote
System control number
(OCoLC)on1085513706
Label
2020 census : examining cost overruns, information security, and accuracy : hearing before the Committee on Homeland Security and Governmental Affairs, United States Senate, One Hundred Fifteenth Congress, first session, October 31, 2017
Publication
Bibliography note
Includes bibliographical references
Carrier category
online resource
Carrier category code
cr
Carrier MARC source
rdacarrier
Color
black and white
Content category
text
Content type code
txt
Content type MARC source
rdacontent
Dimensions
unknown
Extent
1 online resource (iii, 228 pages)
File format
one file format
Form of item
online
Media category
computer
Media MARC source
rdamedia
Media type code
c
Other physical details
illustrations.
Specific material designation
remote
System control number
(OCoLC)on1085513706

Library Locations

  • African Studies LibraryBorrow it
    771 Commonwealth Avenue, 6th Floor, Boston, MA, 02215, US
    42.350723 -71.108227
  • Alumni Medical LibraryBorrow it
    72 East Concord Street, Boston, MA, 02118, US
    42.336388 -71.072393
  • Astronomy LibraryBorrow it
    725 Commonwealth Avenue, 6th Floor, Boston, MA, 02445, US
    42.350259 -71.105717
  • Fineman and Pappas Law LibrariesBorrow it
    765 Commonwealth Avenue, Boston, MA, 02215, US
    42.350979 -71.107023
  • Frederick S. Pardee Management LibraryBorrow it
    595 Commonwealth Avenue, Boston, MA, 02215, US
    42.349626 -71.099547
  • Howard Gotlieb Archival Research CenterBorrow it
    771 Commonwealth Avenue, 5th Floor, Boston, MA, 02215, US
    42.350723 -71.108227
  • Mugar Memorial LibraryBorrow it
    771 Commonwealth Avenue, Boston, MA, 02215, US
    42.350723 -71.108227
  • Music LibraryBorrow it
    771 Commonwealth Avenue, 2nd Floor, Boston, MA, 02215, US
    42.350723 -71.108227
  • Pikering Educational Resources LibraryBorrow it
    2 Silber Way, Boston, MA, 02215, US
    42.349804 -71.101425
  • School of Theology LibraryBorrow it
    745 Commonwealth Avenue, 2nd Floor, Boston, MA, 02215, US
    42.350494 -71.107235
  • Science & Engineering LibraryBorrow it
    38 Cummington Mall, Boston, MA, 02215, US
    42.348472 -71.102257
  • Stone Science LibraryBorrow it
    675 Commonwealth Avenue, Boston, MA, 02445, US
    42.350103 -71.103784
Processing Feedback ...