Borrow it
- African Studies Library
- Alumni Medical Library
- Astronomy Library
- Fineman and Pappas Law Libraries
- Frederick S. Pardee Management Library
- Howard Gotlieb Archival Research Center
- Mugar Memorial Library
- Music Library
- Pikering Educational Resources Library
- School of Theology Library
- Science & Engineering Library
- Stone Science Library
The Resource Actions by the Bonneville Power Administration to Implement the Long- Term Contracting Provisions of P.L. 96-501
Actions by the Bonneville Power Administration to Implement the Long- Term Contracting Provisions of P.L. 96-501
Resource Information
The item Actions by the Bonneville Power Administration to Implement the Long- Term Contracting Provisions of P.L. 96-501 represents a specific, individual, material embodiment of a distinct intellectual or artistic creation found in Boston University Libraries.This item is available to borrow from all library branches.
Resource Information
The item Actions by the Bonneville Power Administration to Implement the Long- Term Contracting Provisions of P.L. 96-501 represents a specific, individual, material embodiment of a distinct intellectual or artistic creation found in Boston University Libraries.
This item is available to borrow from all library branches.
- Summary
- P.L. 96-501, which provides for regional electric power planning and development in the Pacific Northwest, emphasizes the use of conservation and renewable resources, preservation of the region's fish and wildlife, and protection of the environment. The Act requires the Bonneville Power Administration (BPA) to keep the cognizant congressional committees fully and currently informed of actions taken and to be taken by the Administrator under this Act. Based on limited review, it appears that BPA has latitude in how it could implement section 5(g)(1). The statute says that, within 9 months of the Act's effective date, BPA has to (1) begin necessary negotiations which would lead to initial long-term contracts and (2) make valid offers to its customers. Under section 5(g)(1), BPA had several options it could choose regarding offers and negotiations. BPA made the management decision to enter into negotiations for more than 8 months in an effort to draft contracts based on information obtained during the negotiating process. While the Act allows for negotiations for a period of 1 year after the offering of contracts, it appears that BPA management decided it would be better to complete as much of the negotiation phase as possible prior to offering the contracts
- Language
- eng
- Label
- Actions by the Bonneville Power Administration to Implement the Long- Term Contracting Provisions of P.L. 96-501
- Title
- Actions by the Bonneville Power Administration to Implement the Long- Term Contracting Provisions of P.L. 96-501
- Language
- eng
- Summary
- P.L. 96-501, which provides for regional electric power planning and development in the Pacific Northwest, emphasizes the use of conservation and renewable resources, preservation of the region's fish and wildlife, and protection of the environment. The Act requires the Bonneville Power Administration (BPA) to keep the cognizant congressional committees fully and currently informed of actions taken and to be taken by the Administrator under this Act. Based on limited review, it appears that BPA has latitude in how it could implement section 5(g)(1). The statute says that, within 9 months of the Act's effective date, BPA has to (1) begin necessary negotiations which would lead to initial long-term contracts and (2) make valid offers to its customers. Under section 5(g)(1), BPA had several options it could choose regarding offers and negotiations. BPA made the management decision to enter into negotiations for more than 8 months in an effort to draft contracts based on information obtained during the negotiating process. While the Act allows for negotiations for a period of 1 year after the offering of contracts, it appears that BPA management decided it would be better to complete as much of the negotiation phase as possible prior to offering the contracts
- Cataloging source
- DTICE
- Index
- no index present
- Literary form
- non fiction
- http://library.link/vocab/relatedWorkOrContributorName
- GENERAL ACCOUNTING OFFICE WASHINGTON DC ENERGY AND MINERALS DIV
- http://library.link/vocab/subjectName
-
- Contracts
- Electric power
- Public utilities
- Legislation
- Marketing
- Decision making
- Contract administration
- Long range(time)
- Consumers
- Awards
- Administration and Management
- Civil Engineering
- Label
- Actions by the Bonneville Power Administration to Implement the Long- Term Contracting Provisions of P.L. 96-501
- Carrier category
- online resource
- Carrier category code
-
- cr
- Carrier MARC source
- rdacarrier
- Content category
- text
- Content type code
-
- txt
- Content type MARC source
- rdacontent
- Extent
- 14 pages
- Form of item
- online
- Governing access note
- APPROVED FOR PUBLIC RELEASE
- Media category
- computer
- Media MARC source
- rdamedia
- Media type code
-
- c
- Note
- Hein Online
- System control number
-
- (OCoLC)227516529
- (OCoLC)ocn227516529
- Label
- Actions by the Bonneville Power Administration to Implement the Long- Term Contracting Provisions of P.L. 96-501
- Carrier category
- online resource
- Carrier category code
-
- cr
- Carrier MARC source
- rdacarrier
- Content category
- text
- Content type code
-
- txt
- Content type MARC source
- rdacontent
- Extent
- 14 pages
- Form of item
- online
- Governing access note
- APPROVED FOR PUBLIC RELEASE
- Media category
- computer
- Media MARC source
- rdamedia
- Media type code
-
- c
- Note
- Hein Online
- System control number
-
- (OCoLC)227516529
- (OCoLC)ocn227516529
Library Locations
-
African Studies LibraryBorrow it771 Commonwealth Avenue, 6th Floor, Boston, MA, 02215, US42.350723 -71.108227
-
-
Astronomy LibraryBorrow it725 Commonwealth Avenue, 6th Floor, Boston, MA, 02445, US42.350259 -71.105717
-
Fineman and Pappas Law LibrariesBorrow it765 Commonwealth Avenue, Boston, MA, 02215, US42.350979 -71.107023
-
Frederick S. Pardee Management LibraryBorrow it595 Commonwealth Avenue, Boston, MA, 02215, US42.349626 -71.099547
-
Howard Gotlieb Archival Research CenterBorrow it771 Commonwealth Avenue, 5th Floor, Boston, MA, 02215, US42.350723 -71.108227
-
-
Music LibraryBorrow it771 Commonwealth Avenue, 2nd Floor, Boston, MA, 02215, US42.350723 -71.108227
-
Pikering Educational Resources LibraryBorrow it2 Silber Way, Boston, MA, 02215, US42.349804 -71.101425
-
School of Theology LibraryBorrow it745 Commonwealth Avenue, 2nd Floor, Boston, MA, 02215, US42.350494 -71.107235
-
Science & Engineering LibraryBorrow it38 Cummington Mall, Boston, MA, 02215, US42.348472 -71.102257
-
Embed
Settings
Select options that apply then copy and paste the RDF/HTML data fragment to include in your application
Embed this data in a secure (HTTPS) page:
Layout options:
Include data citation:
<div class="citation" vocab="http://schema.org/"><i class="fa fa-external-link-square fa-fw"></i> Data from <span resource="http://link.bu.edu/portal/Actions-by-the-Bonneville-Power-Administration-to/VSG1j-1keqM/" typeof="Book http://bibfra.me/vocab/lite/Item"><span property="name http://bibfra.me/vocab/lite/label"><a href="http://link.bu.edu/portal/Actions-by-the-Bonneville-Power-Administration-to/VSG1j-1keqM/">Actions by the Bonneville Power Administration to Implement the Long- Term Contracting Provisions of P.L. 96-501</a></span> - <span property="potentialAction" typeOf="OrganizeAction"><span property="agent" typeof="LibrarySystem http://library.link/vocab/LibrarySystem" resource="http://link.bu.edu/"><span property="name http://bibfra.me/vocab/lite/label"><a property="url" href="http://link.bu.edu/">Boston University Libraries</a></span></span></span></span></div>
Note: Adjust the width and height settings defined in the RDF/HTML code fragment to best match your requirements
Preview
Cite Data - Experimental
Data Citation of the Item Actions by the Bonneville Power Administration to Implement the Long- Term Contracting Provisions of P.L. 96-501
Copy and paste the following RDF/HTML data fragment to cite this resource
<div class="citation" vocab="http://schema.org/"><i class="fa fa-external-link-square fa-fw"></i> Data from <span resource="http://link.bu.edu/portal/Actions-by-the-Bonneville-Power-Administration-to/VSG1j-1keqM/" typeof="Book http://bibfra.me/vocab/lite/Item"><span property="name http://bibfra.me/vocab/lite/label"><a href="http://link.bu.edu/portal/Actions-by-the-Bonneville-Power-Administration-to/VSG1j-1keqM/">Actions by the Bonneville Power Administration to Implement the Long- Term Contracting Provisions of P.L. 96-501</a></span> - <span property="potentialAction" typeOf="OrganizeAction"><span property="agent" typeof="LibrarySystem http://library.link/vocab/LibrarySystem" resource="http://link.bu.edu/"><span property="name http://bibfra.me/vocab/lite/label"><a property="url" href="http://link.bu.edu/">Boston University Libraries</a></span></span></span></span></div>