The Resource Performance-based earned value, Paul J. Solomon, Ralph R. Young, (electronic resource)

Performance-based earned value, Paul J. Solomon, Ralph R. Young, (electronic resource)

Label
Performance-based earned value
Title
Performance-based earned value
Statement of responsibility
Paul J. Solomon, Ralph R. Young
Creator
Contributor
Provider
Publisher
Subject
Language
eng
Cataloging source
HS0
http://library.link/vocab/creatorDate
1942-
http://library.link/vocab/creatorName
Solomon, Paul J.
Illustrations
illustrations
Index
index present
LC call number
TS168
LC item number
.S65 2007
Literary form
non fiction
Nature of contents
  • dictionaries
  • bibliography
http://library.link/vocab/relatedWorkOrContributorName
  • IEEE Xplore
  • John Wiley & Sons
  • Institute of Electrical and Electronics Engineers
  • Young, Ralph Rowland
http://library.link/vocab/subjectName
  • Value analysis (Cost control)
  • Performance
  • Production control
  • Systems engineering
  • Project management
  • Performance
  • Production control
  • Project management
  • Systems engineering
  • Value analysis (Cost control)
Label
Performance-based earned value, Paul J. Solomon, Ralph R. Young, (electronic resource)
Instantiates
Publication
Note
Made available via IEEE Xplore Digital Library
Bibliography note
Includes bibliographical references and index
Carrier category
online resource
Carrier category code
  • cr
Carrier MARC source
rdacarrier
Color
multicolored
Content category
text
Content type code
  • txt
Content type MARC source
rdacontent
Dimensions
unknown
Extent
1 online resource (1 volume)
Form of item
online
Isbn
9780471721888
Media category
computer
Media MARC source
rdamedia
Media type code
  • c
Reproduction note
Electronic reproduction.
Specific material designation
remote
System control number
  • (OCoLC)758542714
  • (OCoLC)ocn758542714
Label
Performance-based earned value, Paul J. Solomon, Ralph R. Young, (electronic resource)
Publication
Note
Made available via IEEE Xplore Digital Library
Bibliography note
Includes bibliographical references and index
Carrier category
online resource
Carrier category code
  • cr
Carrier MARC source
rdacarrier
Color
multicolored
Content category
text
Content type code
  • txt
Content type MARC source
rdacontent
Dimensions
unknown
Extent
1 online resource (1 volume)
Form of item
online
Isbn
9780471721888
Media category
computer
Media MARC source
rdamedia
Media type code
  • c
Reproduction note
Electronic reproduction.
Specific material designation
remote
System control number
  • (OCoLC)758542714
  • (OCoLC)ocn758542714

Library Locations

  • African Studies LibraryBorrow it
    771 Commonwealth Avenue, 6th Floor, Boston, MA, 02215, US
    42.350723 -71.108227
  • Alumni Medical LibraryBorrow it
    72 East Concord Street, Boston, MA, 02118, US
    42.336388 -71.072393
  • Astronomy LibraryBorrow it
    725 Commonwealth Avenue, 6th Floor, Boston, MA, 02445, US
    42.350259 -71.105717
  • Fineman and Pappas Law LibrariesBorrow it
    765 Commonwealth Avenue, Boston, MA, 02215, US
    42.350979 -71.107023
  • Frederick S. Pardee Management LibraryBorrow it
    595 Commonwealth Avenue, Boston, MA, 02215, US
    42.349626 -71.099547
  • Howard Gotlieb Archival Research CenterBorrow it
    771 Commonwealth Avenue, 5th Floor, Boston, MA, 02215, US
    42.350723 -71.108227
  • Mugar Memorial LibraryBorrow it
    771 Commonwealth Avenue, Boston, MA, 02215, US
    42.350723 -71.108227
  • Music LibraryBorrow it
    771 Commonwealth Avenue, 2nd Floor, Boston, MA, 02215, US
    42.350723 -71.108227
  • Pikering Educational Resources LibraryBorrow it
    2 Silber Way, Boston, MA, 02215, US
    42.349804 -71.101425
  • School of Theology LibraryBorrow it
    745 Commonwealth Avenue, 2nd Floor, Boston, MA, 02215, US
    42.350494 -71.107235
  • Science & Engineering LibraryBorrow it
    38 Cummington Mall, Boston, MA, 02215, US
    42.348472 -71.102257
  • Stone Science LibraryBorrow it
    675 Commonwealth Avenue, Boston, MA, 02445, US
    42.350103 -71.103784
Processing Feedback ...