The Resource The U.S. Department of Defense's Earned Value Management-Analyst Workforce, Stephanie Young, Daniel Tremblay, Ronald J. Yardley

The U.S. Department of Defense's Earned Value Management-Analyst Workforce, Stephanie Young, Daniel Tremblay, Ronald J. Yardley

Label
The U.S. Department of Defense's Earned Value Management-Analyst Workforce
Title
The U.S. Department of Defense's Earned Value Management-Analyst Workforce
Statement of responsibility
Stephanie Young, Daniel Tremblay, Ronald J. Yardley
Creator
Contributor
Author
Issuing body
Subject
Language
eng
Summary
"The role of earned value management (EVM) as a tool for integrated program management across the U.S. Department of Defense (DoD) has increased in prominence in recent years. The focal point for all policy, guidance, and competency relating to EVM is the deputy director of the Performance Assessments and Root Cause Analyses (PARCA) Earned Value Management (EVM) division, who serves as the functional lead for EVM, a cross-functional acquisition community. As a cross-functional community, EVM faces challenges in workforce management that communities in designated career fields do not face. EVM is not a career field in itself, and DoD does not systematically track its workforce for the purposes of workforce planning in the same way that it tracks members of designated career fields. The research reported here surveyed the DoD EVM-analyst workforce and described the population across several dimensions. Yet, insight into the EVM-analyst workforce is necessary for the execution of PARCA's responsibilities to support the development and integration of EVM competencies across the defense acquisition workforce." --Back cover
Member of
Cataloging source
YDXCP
http://library.link/vocab/creatorName
Young, Stephanie
Illustrations
illustrations
Index
no index present
Literary form
non fiction
Nature of contents
bibliography
http://library.link/vocab/relatedWorkOrContributorName
  • Tremblay, Daniel
  • Yardley, Roland J.
  • Rand Corporation
  • National Defense Research Institute (U.S.)
Series statement
Research report
Series volume
RR-1254-OSD
http://library.link/vocab/subjectName
  • United States
  • United States
  • Purchasing agents
  • United States
  • Armed Forces
  • Personnel management
  • Purchasing agents
  • United States
Label
The U.S. Department of Defense's Earned Value Management-Analyst Workforce, Stephanie Young, Daniel Tremblay, Ronald J. Yardley
Instantiates
Publication
Copyright
Note
  • "National Defense Research Institute." --Title page
  • "RR-1254-OSD"--P. 4 of cover
  • "Prepared for Performance Assessments and Root Cause Analyses." --Title page
Bibliography note
Includes bibliographical references (pages 31-32)
Carrier category
volume
Carrier category code
  • nc
Carrier MARC source
rdacarrier
Content category
text
Content type code
  • txt
Content type MARC source
rdacontent
Contents
Data-Call Purpose and Approach -- Findings -- Potential Applications -- Concluding Observations
Dimensions
26 cm.
Extent
xvi, 32 pages
Isbn
9780833091963
Media category
unmediated
Media MARC source
rdamedia
Media type code
  • n
Other physical details
illustrations (chiefly color)
System control number
  • (OCoLC)933585864
  • (OCoLC)ocn933585864
Label
The U.S. Department of Defense's Earned Value Management-Analyst Workforce, Stephanie Young, Daniel Tremblay, Ronald J. Yardley
Publication
Copyright
Note
  • "National Defense Research Institute." --Title page
  • "RR-1254-OSD"--P. 4 of cover
  • "Prepared for Performance Assessments and Root Cause Analyses." --Title page
Bibliography note
Includes bibliographical references (pages 31-32)
Carrier category
volume
Carrier category code
  • nc
Carrier MARC source
rdacarrier
Content category
text
Content type code
  • txt
Content type MARC source
rdacontent
Contents
Data-Call Purpose and Approach -- Findings -- Potential Applications -- Concluding Observations
Dimensions
26 cm.
Extent
xvi, 32 pages
Isbn
9780833091963
Media category
unmediated
Media MARC source
rdamedia
Media type code
  • n
Other physical details
illustrations (chiefly color)
System control number
  • (OCoLC)933585864
  • (OCoLC)ocn933585864

Library Locations

  • African Studies LibraryBorrow it
    771 Commonwealth Avenue, 6th Floor, Boston, MA, 02215, US
    42.350723 -71.108227
  • Alumni Medical LibraryBorrow it
    72 East Concord Street, Boston, MA, 02118, US
    42.336388 -71.072393
  • Astronomy LibraryBorrow it
    725 Commonwealth Avenue, 6th Floor, Boston, MA, 02445, US
    42.350259 -71.105717
  • Fineman and Pappas Law LibrariesBorrow it
    765 Commonwealth Avenue, Boston, MA, 02215, US
    42.350979 -71.107023
  • Frederick S. Pardee Management LibraryBorrow it
    595 Commonwealth Avenue, Boston, MA, 02215, US
    42.349626 -71.099547
  • Howard Gotlieb Archival Research CenterBorrow it
    771 Commonwealth Avenue, 5th Floor, Boston, MA, 02215, US
    42.350723 -71.108227
  • Mugar Memorial LibraryBorrow it
    771 Commonwealth Avenue, Boston, MA, 02215, US
    42.350723 -71.108227
  • Music LibraryBorrow it
    771 Commonwealth Avenue, 2nd Floor, Boston, MA, 02215, US
    42.350723 -71.108227
  • Pikering Educational Resources LibraryBorrow it
    2 Silber Way, Boston, MA, 02215, US
    42.349804 -71.101425
  • School of Theology LibraryBorrow it
    745 Commonwealth Avenue, 2nd Floor, Boston, MA, 02215, US
    42.350494 -71.107235
  • Science & Engineering LibraryBorrow it
    38 Cummington Mall, Boston, MA, 02215, US
    42.348472 -71.102257
  • Stone Science LibraryBorrow it
    675 Commonwealth Avenue, Boston, MA, 02445, US
    42.350103 -71.103784
Processing Feedback ...